Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the uael domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /usr/local/lsws/blizzardpress.dev/rfta2023/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /usr/local/lsws/blizzardpress.dev/rfta2023/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /usr/local/lsws/blizzardpress.dev/rfta2023/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the astra-addon domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /usr/local/lsws/blizzardpress.dev/rfta2023/wp-includes/functions.php on line 6114
PUBLIC NOTICE: Rio Grande Trail Asphalt Repair Project Construction Impacts Starting May 20th - RFTA
Search
Close this search box.

PUBLIC NOTICE: Rio Grande Trail Asphalt Repair Project Construction Impacts Starting May 20th

Starting on May 20, 2024, the Rio Grande Trail from Emma Road to the Catherine Bridge Trailhead will be under construction in four phases from Mile Post 21.5 to 16.0.

The Roaring Fork Transportation Authority (RFTA) and Holmes Excavation are excited to bring a much needed improvement to the Rio Grande Trail. We appreciate your patience, cooperation, and understanding as we work to repair and replace asphalt, ensuring a smoother and safer trail experience.

To minimize disruption and ensure efficiency, trail repairs will unfold in four distinct phases:
Phase One: Emma Rd to Hooks Spur Trailhead (MP 21.5 to 20.5) STARTING MAY 20, 2024.
Phase Two: Hooks Spur Trailhead to Rock Bottom Ranch (MP 20.5 to 18.5).
Phase Three: Rock Bottom Ranch to the Catherine Bridge Trailhead (MP 18.5 to 16.0).
Phase Four: Crack Sealing along the RGT from 29th St in GWS up valley to Emma Rd; the trail will remain open during this phase of work. (MP 2.0 to 21.5).

Follow All Posted Detours: RFTA and Holmes Excavation will establish temporary detours for trail users to navigate around construction zones safely. Please follow all trail closures and detours for your safety and the safety of our workers.

Your tax dollars are hard at work, enhancing our beloved Rio Grande Trail with RFTA Destination 2040.

Map of the Rio Grande Trail showing each phase of construction and affected areas: Phase One: Emma Rd to Hooks Spur Trailhead (MP 21.5 to 20.5) STARTING MAY 20, 2024. Phase Two: Hooks Spur Trailhead to Rock Bottom Ranch (MP 20.5 to 18.5). Phase Three: Rock Bottom Ranch to the Catherine Bridge Trailhead (MP 18.5 to 16.0). Phase Four: Crack Sealing along the RGT from 29th St in GWS up valley to Emma Rd; the trail will remain open during this phase of work. (MP 2.0 to 21.5).

Scroll to Top