Search
Close this search box.

PUBLIC NOTICE: Rio Grande Trail Asphalt Repair Project Construction Impacts Updates

PHASE ONE of asphalt repair that started in May, on the Rio Grande Trail from Emma Road to Hooks Spur Trailhead (mile post 21.5 to 20.5) is OPEN.

PHASE TWO of asphalt repair started on June 3rd, on the Rio Grande Trail from Hook Spur trailhead to Rock Bottom Ranch, mile post 20.5 to 18.5. This section of the trail will be CLOSED until further notice. Please follow the detour for your safety and the safety of our workers. DETOUR ROUTE: Take Hooks Spur Road past Rock Bottom Ranch where you will be able to connect back onto the Rio Grande Trail.

Map of Emma to Hooks Spur Trailhead re-opening on the Rio Grande Trail      Illustration of map of phase two of the rio grande trail asphalt repair project showing closure from hooks lane to rock bottom ranch. Detour is hooks spur road.

The Roaring Fork Transportation Authority (RFTA) and Holmes Excavation are excited to bring a much needed improvement to the Rio Grande Trail. We appreciate your patience, cooperation, and understanding as we work to repair and replace asphalt, ensuring a smoother and safer trail experience.

To minimize disruption and ensure efficiency, trail repairs will unfold in four distinct phases:
Phase One: Emma Rd to Hooks Spur Trailhead (MP 21.5 to 20.5) RE-OPENED
Phase Two: Hooks Spur Trailhead to Rock Bottom Ranch (MP 20.5 to 18.5). CLOSED from June 3, 2024 until further notice.
Phase Three: Rock Bottom Ranch to the Catherine Bridge Trailhead (MP 18.5 to 16.0).
Phase Four: Crack Sealing along the RGT from 29th St in GWS up valley to Emma Rd; the trail will remain open during this phase of work. (MP 2.0 to 21.5).

Follow All Posted Detours: RFTA and Holmes Excavation will establish temporary detours for trail users to navigate around construction zones safely. Please follow all trail closures and detours for your safety and the safety of our workers.

Your tax dollars are hard at work, enhancing our beloved Rio Grande Trail with RFTA Destination 2040.

Map of the Rio Grande Trail showing each phase of construction and affected areas: Phase One: Emma Rd to Hooks Spur Trailhead (MP 21.5 to 20.5) STARTING MAY 20, 2024. Phase Two: Hooks Spur Trailhead to Rock Bottom Ranch (MP 20.5 to 18.5). Phase Three: Rock Bottom Ranch to the Catherine Bridge Trailhead (MP 18.5 to 16.0). Phase Four: Crack Sealing along the RGT from 29th St in GWS up valley to Emma Rd; the trail will remain open during this phase of work. (MP 2.0 to 21.5).

 

 

 

Scroll to Top